翻訳と辞書
Words near each other
・ Park Lane Racing
・ Park Lane railway goods station
・ Park Lane Station
・ Park Lane Tower (Dubai)
・ Park Langley
・ Park Laurie
・ Park Lavrov
・ Park Lawn Cemetery
・ Park Layne, Ohio
・ Park Leaze Halt railway station
・ Park Lee-chun
・ Park Live
・ Park Live Festival
・ Park Lodge
・ Park M. Strader
Park Mains High School
・ Park Manor
・ Park Manross
・ Park Meadows
・ Park Mee-kyung
・ Park metro station
・ Park Mi-hyun
・ Park Mi-kum
・ Park Mi-ra
・ Park Mi-sun
・ Park Mi-young
・ Park Michigan
・ Park Middle School
・ Park Min
・ Park Min-chul


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Park Mains High School : ウィキペディア英語版
Park Mains High School

Park Mains High School is a secondary school in Erskine, Renfrewshire. It is one of the biggest schools in Scotland. As well as taking in students from the town it also enrols them from the surrounding areas of Bishopton, Inchinnan and Langbank. Valerie Mackay is the Acting Head Teacher.
==New school building (2012-present)==
Renfrewshire Council granted a new multi-million pound rebuild of the school. The new building was opened in August 2012 at a cost of £31m. It was designed and planned by Holmes Miller. Construction was completed by Bam Construction. FES Ltd were the contractors for the electrical, mechanical, IT installations and fire and security systems.〔http://www.renfrewshirechamber.com/documents/renfrewopenevening.pdf〕 The building offers a larger, brighter space for the pupils to feel in a social hub whilst still being in a controlled learning environment. One key feature of the school is the central 'street area' flooded with natural sunlight and creating a more encouraging and peaceful school space. The school's new sports complex boasts an enormous multi-use games hall and gymnasium. In the fitness suite several pieces of equipment have built in TV channels and the room has 2 flat-screen TVs playing out the latest chart hits. The site of the old school building is now a £400,000 multi-use 3G sports pitch with running track. There is also hockey pitches and a rugby field. The school building has regularly featured in architectural publications. It has received award nominations for its design and construction.
Along with the move to the new building, the school initiated a smarter uniform to help improve the ethos of the school. This required blazers for all S5 and S6 pupils and girls to wear knee length skirts. Blazers remained optional for S1-S4 as did trousers for girls in cold weather.
The old school took 69 days in total to completely demolish.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Park Mains High School」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.